Eglin 1—Team 12: Biodiesel Plant

This is a listing of all of the deliverables our team has had to turn in for our Senior Design Class.  Feel free to look at any of them.

In the beginning of the Fall semester our team sat down and drafted a code of conduct for the members of our team to follow through the course of the year.

This assignment forced us do define some key elements of our project.

As our design of the project changed, we needed to redefine our project scope to refocus on what we needed to accomplish in the second semester.

This was the first assignment of the spring semester to get the ball rolling on construction of our project.

In this assignment we looked up background information and thought about the basic parts of our project we needed to design.

Code of Conduct (Due 9/11/2007)

Final Design Report

Restated Project Scope

Project Specifications

Needs Assessment/Project Scope

Deliverables

The image “http://www.mansfieldct.org/schools/mms/staff/stake/Image2.gif” cannot be displayed, because it contains errors.http://www.lincolnnet.net/users/lrpgwrks/http/images/hammer.gifThe image “http://www.rike.com/images/Contract.gif” cannot be displayed, because it contains errors.

This is our final senior design project report.  It includes all appendices as well as last semester’s report.

Our plant is kind of complicated.  This manual will allow the average user to use our biodiesel production plant successfully.

Operations Manual

Final Report