Eglin 1—Team 12: Biodiesel Plant |
|
This is a listing of all of the deliverables our team has had to turn in for our Senior Design Class. Feel free to look at any of them. |
|
In the beginning of the Fall semester our team sat down and drafted a code of conduct for the members of our team to follow through the course of the year. |
|
This assignment forced us do define some key elements of our project. |
|
As our design of the project changed, we needed to redefine our project scope to refocus on what we needed to accomplish in the second semester. |
|
This was the first assignment of the spring semester to get the ball rolling on construction of our project. |
|
In this assignment we looked up background information and thought about the basic parts of our project we needed to design. |
|
Code of Conduct (Due 9/11/2007) |
|
Final Design Report |
|
Restated Project Scope |
|
Project Specifications |
|
Needs Assessment/Project Scope |
|
Deliverables |



|
This is our final senior design project report. It includes all appendices as well as last semester’s report. |
|
Our plant is kind of complicated. This manual will allow the average user to use our biodiesel production plant successfully. |
|
Operations Manual |
|
Final Report |