|
1. Team Building Activity 2. Project Specification/Schedule 3. Concept Generation and Selection 4. Interim Design Review 5. Final Design Review 6. Spring Proposal |
|
Fall 2008 Schedule |
|
Spring 2009 Schedule |
|
1. Update System 2. Analyze the System 3. Perfect Subsystem Problems 4. Run System 5. Final System Adjustments 6. Final Design and Model 7. Senior Design Open House |
|
Senior Design 2008—2009, Group 2 |
|
National High Magnetic Field Laboratory (NHMFL) 900 MHz NMR Probe |
|
Project Schedule |