1. Team Building Activity

2. Project Specification/Schedule

3. Concept Generation and Selection

4. Interim Design Review

5. Final Design Review

6. Spring Proposal

Fall 2008 Schedule

Spring 2009 Schedule

1. Update System

2. Analyze the System

3. Perfect Subsystem Problems

4. Run System

5. Final System Adjustments

6. Final Design and Model

7. Senior Design Open House

Senior Design 2008—2009, Group 2

National High Magnetic Field Laboratory (NHMFL) 900 MHz NMR Probe

Project Schedule