Home        The Group        Sponsor        Gallery        Presentations        Deliverables        Events           

Deliverables



Design Phase (Fall 2011) -

Deliverable 1: Code of Conduct
Deliverable 2: Needs Assessment and Project Scope
Deliverable 3: Product Specification and Project Plan
Deliverable 4: Concept Generation and Selection
Deliverable 5: Final Concept and Design

Construction Phase (Spring 2012) -

Deliverable 6: Project Scope
                     Project Plan
Deliverable 7: Final Report
Deliverable 8: Operations Manual