Welcome to the Group 1 Senior Design Page!

Our project is being sponsored by Dr. Joel House from Eglin Air Force Base's Munitions Directorate which is a branch of the Air Force Research Laboratory (AFRL). Our project goal is to continue last year's senior design project by upgrading their existing system; two specific areas of focus are the striker bar mechanism and the data acquisiton system. It is our goal to improve the striker velocity such that we are able to reliably reproduce strain rates of at least 500MPa and at the same time improve the data aquistion system's sampling rate to provide a high level of resolution in the gathered data.

Recent News

 

April 17, 2013

We are presenting our final presentation to the MEAC, our professors, and our peers on 04/18/2013 at 8:45am in the HPMI building. We will also linger around for a poster session at 4pm in the AME building.

April 8, 2013

We have successfully deformed 99.9999% pure copper specimens to an average strain value of 0.3. Our crossbow mechanism works as intended. We are currently trying to work out any lingering kinks in our data acquisition system.