Welcome to Senior Design Team 5, Turbocor Sponsored, website. Navigate the site using the links at the left in green. Take a look around and thanks for visiting! 

This design project was proposed by Turbocor in an effort to strengthen their manufacturing process that takes place locally in Tallahassee, Fl. The design team consists of 4 seniors of mechanical engineering. The project was assigned in August 2012, and has an expected completion time of April 2013.
Project Scope
The objectives of this project are to build a testing rig that will test the X, Y, and Z displacements. The maximum displacement of only 400 micrometers are tested, thus it is imperative that the measurements are precise. Although there are no size constraints for the
testing rig, our system must be low cost. The time to test the sensors is currently about 150 seconds. This is to be reduced if possible.