9/7 Team meet and assign responsabilities
9/25 First meet with sponsor and the team is put up to date on the project
10/20 Team reaches 7,000RPM until they meet the vibration roadblock last years team meet
   Team discovers faulty system assembly and need to re-work a coupling system.
12/1 New coupler design is found and now proceeds to manufacturing
2018
1/8 Slight modification to the coupler design is required for cost reduction
  New goal is to test the coupling design with a mock torque transducer
1/25 New assembly system is designed and presented to danfoss
3/23 Assemble mock torque transducer and prepare for testing
4/5 Test stand is assembeled and laser aligned
4/6 Motor is tested to 10,000rpm Results TBD
Future team should install the torque transducer and high speed couplers
Implementation of a cooling system would be required for continuous use as well