2017

9/7 Team meet and assign responsabilities

9/25 First meet with sponsor and the team is put up to date on the project

10/20 Team reaches 7,000RPM until they meet the vibration roadblock last years team meet
      Team discovers faulty system assembly and need to re-work a coupling system.

12/1 New coupler design is found and now proceeds to manufacturing

2018

1/8 Slight modification to the coupler design is required for cost reduction
    New goal is to test the coupling design with a mock torque transducer

1/25 New assembly system is designed and presented to danfoss

3/23 Assemble mock torque transducer and prepare for testing

4/5 Test stand is assembeled and laser aligned

4/6 Motor is tested to 10,000rpm Results TBD

Future team should install the torque transducer and high speed couplers
Implementation of a cooling system would be required for continuous use as well


Contacts

Senior Design Instructors

Dr.Shayne McConomy smcconomy@eng.fsu.edu

Dr. Chiang Shih shih@eng.fsu.edu

Staff Advisor

Dr.Patrick Hollis hollis@eng.fsu.edu

Liaison Officer

Mr. William Sun william.sun@danfoss.com