4.6(b) Maximum Shear Stress (Contd.)

Previous: 4-6 Maximum Shear Stress (Contd)

Normal stress

Shear stress

But

Next: 4-6(c)Maximum Shear Stress (Contd.)

10/16/01 0:56:25
10/18/01 0:01:37