Scribbled down at our various meetings...

Page: [1]  [2]

10/29/00

  • Worked on midpoint review presentation

11/13/00
  • Concepts

    • Keep washer/extractor separate, change tubs to plastic

      • Separate pieces of plastic, sealed together

      • Mold entire thing and make partitions

      • Mold entire thing with partitions already molded into it

      • Three separate tubs with prongs to assemble them

      • Change control panel to plastic

      • Bolt plastic body to frame or bend

    • Combine washer and extractor

    • Keep control panel same shape or make square instead of bending

  • Things to find out:

    • Thickness of plastic needed

    • How much water will be fed into tub

  • Things to do the rest of the week:

    • Call suppliers

11/14/00
  • Questions for suppliers

    • Processing costs: are the different mold shapes cheaper

  • Notes from clients

    • Concept 4: two tubs, water tight middle tub

    • Concept 3: looks expensive

    • Concept 2: low assembly cost, moderate tooling cost

    • Hot polypropylene glue (plastic welding)

    • Concept 1: good concept

    • Plastic must be able to support electrical housings without combusting (ETL rating)

    • Manifold system for water inlet

    • Find other ideas for water distributing system (if necessary)

    • Find out about Fiber-Reinforced Composites Association

11/20/00
  • Coming up with a new timeline & schedule

  • Coming up with new work break down structure

  • Break up tasks:

    • Call suppliers(costs, ETL rating)

    • Do more research on the plastics

    • Labor study: complete

  • Things to include in report

  • Things to include in presentation

11/28/00
  • Additional research on plastics

  • Worked on final report and Pro-E drawings

11/29/00
  • Finalize final report and presentation

  • Practice final presentation