Automation of the RIDFT

Resin Infusion between Double Flexible Tooling

  • Home
  • Minutes
  • Deliverables
  • Photos
  • CAD Images
  • About
  • Links
  • Contacts
  • Sponsors
 

Deliverables

Code Of Conduct

Needs Assessment

Product Specification

Updated Product Specification

Define Phase Report (10/25/2012)

Define Phase Presentation

Measure Phase Report

Bill Of Materials

Spring Progress Update Presentation

Analyze Phase Presentation

Analysis Phase Report(02/02/2012)

Design Phase Report(03/01/2012)

Final Report (04/04/2012)

© 2011 Senior Design
Group #27