Research Grants
- Moses, R. (PI). “Evaluation
of Capacity of Roundabouts”. Funded
by the Florida Department of Transportation, Office of Environmental
Management, Victor Muchuruza (Project Manager), December 2016 to June 30, 2018,
$150,000.
- Moses, R.
(PI). “FHWA Safety IV Technical Support for Highway Safety”. Funded by the Federal Highway
Administration through LEIDOS, Brett Graves (Project Manager), December 8, 2015
to March 1, 2017, $218,000.
- Ozguven, E.E. (PI), R.
Moses. (Co-PI) & M. Dulebenets (Co-PI). “Development of Safety Performance Functions for Restricted Crossing
U-Turn (RCUT) Intersections.” Funded by the Florida Department of
Transportation, Traffic Engineering and Operations Office, Alan El-Urfali
(Project Manager), January 1, 2017 to June 30, 2018. $215,000.
- Dulebenets, M. (PI),
Ozguven (Co-PI), E., & Moses, R. (Co-PI). “Establishment
of Effective Control Factors to Achieve Federal Enforcement Consistency with
the Highway Beautification.” Funded
by the Florida Department of Transportation, Office of Right of Way Operations,
Robert Jessee (Project Manager), January 1, 2017 to November 30, 2017. $100,000.
- Dulebenets, M. (PI), E.E.
Ozguven (Co-PI), E., R. Moses (Co-PI), W. Boot (Co-PI), & T. Sando (Co-PI).
“A Comprehensive Assessment of
Driver Characteristics for Efficient Emergency Evacuation in Areas with an
Aging Population.” Funded by the U.S. Department of Transportation and
Center for Accessibility and Safety for an Aging Population, January 15, 2017
to July 15, 2018. $251,755.
- Moses, R.
(PI). “Civil Engineering Support for the Traffic Monitoring Program – Phase V.” Funded by the Florida Department of
Transportation, Transportation Statistics Office, Steve Bentz (Project
Manager), July 17, 2016 to November 17, 2017, $80,000.
- Ozguven, E.E. (PI), A. Vanli, R.
Moses, A. Barrett, & T. Sando. “Travel Time and Roadway Capacity Reliability
for an Aging Population: The Development of a Model Integrating Roadway Traffic
with Aging Adults’ Driving Behavior.”
Internal project funded through the University
Transportation Center grant. $329,605.
- Moses, R. (PI) & E. Ozguven
(Co-PI). “Determination of Trip Generating Characteristics of Transit-Oriented
Developments in Florida.” Funded by
the Florida Department of Transportation, Transit Office, Diane Quigley
(Project Manager), November 15, 2014 to June 30, 2016. $153,000.
- Moses, R. (PI). “Civil Engineering Support for the Traffic Monitoring Program – Phase IV.”
Funded by the Florida Department of Transportation, Transportation
Statistics Office, Richard Reel (Project Manager), January 1, 2014 to
March 30, 2015, $75,000.
- Moses, R. (PI) & E. Ozguven (Co-PI). “Twenty-Four Hour Peaking Relationship to Level of Service and Other Measures of Effectiveness.”
Funded by the Florida Department of Transportation, Systems Planning
Office, Gina Bonyani (Project Manager), May 14, 2013 to December 31,
2014, $150,000.
- Moses,
R. (PI). “Evaluation of Free Flow Speeds on Interrupted Flow Facilities
in the State of Florida.” Funded by the Florida Department of
Transportation, Systems Planning Office, Tyrone Scorsone (Project
Manager), May 1, 2012 to April 30, 2013, $90,500.
- Moses, R. (PI). “Civil Engineering Support for the Traffic
Monitoring Program - Phase III.” Funded by the Florida Department of
Transportation, Transportation Statistics Office, Richard Reel (Project
Manager), January 1, 2012 to March 30, 2013, $75,000.
- Moses, R. (PI). “Development of Speed Models for Improving
Travel Forecasting and Highway Performance Evaluation.” Funded by the
Florida Department of Transportation, Systems Planning Office, Frank
Tabatabaee (Project Manager), June 2, 2011 to December 31, 2013.
$355,500.
- Sando, T. (PI) & R. Moses (Co-PI). “Development of Crash
Modification Factors for Urban Four-lane Roadways with Raised Medians.”
Funded the Florida Department of Transportation, Roadway Design Office,
Mary Ann KoosVictor Wiley (Project Manager), April 1, 2011 to September
30, 2011, $45,000.
- Moses, R. (PI). “Civil Engineering Support for the Traffic
Monitoring Program.” Funded by the Florida Department of
Transportation, Transportation Statistics Office, Richard Reel (Project
Manager), November 12, 2010 to March 31, 2012, $75,000.
- Sando, T. (PI) & R. Moses (Co-PI). “Safety Implications
of Transit Operator Schedule Policies.” Funded the Florida Department
of Transportation, Roadway Design Office, Victor Wiley (Project
Manager), October 1, 2009 to September 30, 2010, $85,000.
- Sando, T. (PI) & R. Moses (Co-PI). “Operational and
Safety Impacts of Restriping Inside Lanes of Urban Multi-lane Curbed
Roadways to 11 feet or less to Create Wider Outside Curb Lanes for
Bicyclists.” Funded by the Florida Department of Transportation,
Roadway Design Office, Mary Ann Koos (Project Manager), June 1, 2009 to
February 28, 2011, $131,536.
- Sando, T. (PI) & R. Moses (Co-PI). “Integrating Transit
into Complete Streets Design Policies.” Funded by the Florida
Department of Transportation, Public Transportation Transit Office, Amy
Datz (Project Manager), November 1, 2008 to April 30, 2009, $78,000.
- Moses, R. (PI). “Civil Engineering Support for the Traffic
Monitoring Program.” Funded by the Florida Department of
Transportation, Transportation Statistics Office, Richard Reel (Program
Manager), November 1, 2008 to January 30, 2010. $75,000.
- Sando, T. (PI) & R. Moses (Co-PI). “Facility Design and
Engineering for Intermodal Transportation Connectivity.” Funded by the
Florida Department of Transportation, Public Transportation Transit
Office, Amy Datz (Project Manager), January 1, 2008 to December 31,
2008, $75,000.
- Moses, R. (PI). “Mining of Florida ITS Data for
Transportation Planning Use.” Funded by the Florida Department of
Transportation, Transportation Statistics Office, Richard Reel (Program
Manager), August 1, 2007 to October 30, 2008. $75,000.
- Spainhour, L. (PI), R. Moses (Co-PI) & J. Sobanjo
(Co-PI). “TraCS Training, Support, and Enhancement.” Funded by the
Florida Department of Transportation, Karen Richardson (Project
Manager), October 1, 2007 to September 30, 2008. $678,888.
- Spainhour, L. (PI), R. Mussa (Co-PI) & J. Sobanjo
(Co-PI). “TraCS Training, Support, and Enhancement.” Funded by the
Florida Department of Transportation, Karen Richardson (Project
Manager), October 13, 2006 to September 30, 2007. $678,888.
- Mussa, R. (PI). “Evaluating the Effectiveness of Various
Truck Lane Restrictions Practices in Florida-Phase II.”, Supplemental
Funding, funded by the Florida Department of Transportation, Carla Sims
(Project Manager), March 1, 2006 to August 31, 2007. $56,000.
- Spainhour, L. (PI), R. Mussa (Co-PI), and J. Sobanjo.
(Co-PI). “TraCS Training, Support, and Enhancement.” Funded by the
Florida Department of Transportation, Carla Sims (Project Manager),
October 5, 2005 to September 30, 2006. $785,994.
- Mussa, R. (PI). “Florida Pre-apprenticeship Training in
Highway Construction.” Funded by the Florida Department of
Transportation, Sylvia Barge (Project Manager), August 2004 to June
2006. $210,000.
- Mussa, R. (PI). “Evaluating the Effectiveness of Various
Truck Lane Restrictions Practices in Florida- Phase II.” Funded by the
Florida Department of Transportation, Eric Larson (Project Manager),
December 1, 2004 to August 31, 2006. $144,000.
- Spainhour, L. (PI), R. Mussa (Co-PI) & J. Sobanjo
(Co-PI). “TraCS Training, Support, and Enhancement.” Funded by the
Florida Department of Transportation, Richard Sotter (Project Manager),
October 5, 2004 to September 30, 2005. $948,733.
- Mussa, R. (PI). “Mining of Florida ITS Data for
Transportation Planning Use.” Funded by the Florida Department of
Transportation, Richard Reel (Program Manager), February 2003 to
September 2005. $75,000.
- Mussa, R. (PI). “Mining of Florida ITS Data for
Transportation Planning Use.” Funded by the Florida Department of
Transportation, Harshad Desai (Program Manager), February 2003 to
September 2005. $350,000.
- Mussa, R. (PI). “Evaluation of Geometrics and Operational
Characteristics Affecting the Safety of Six-Lane Divided Roadways.”
Funded by the Florida Department of Transportation, Patrick Brady
(Project Manager), December 9, 2003 to July 31, 2005. $180,000.
- Mussa, R. (PI). “Traffic Signal Warrant Study at Lipona Road
and Belle Vue Way Intersection.” Funded by the City of Tallahassee, Sal
Arnaldo (Program Manager), October 24, 2003 to December 31, 2003.
$4,000.
- Mussa, R. (PI), L. Spainhour (Co-PI) & J. Sobanjo
(Co-PI). “Implementation of GIS for Crash Data Management, Phase II.”
Funded by the Florida Department of Transportation, Richard Sotter
(Project Manager), December 15, 2003 to September 30, 2004, $150,000.
- Mussa, R, (PI), L. Spainhour (Co-PI) & J. Sobanjo
(Co-PI). “Local Agency Automation Support-Phase II.” Funded by the
Florida Department of Transportation, Richard Sotter (Project Manager),
December 15, 2003 to September 30, 2004, $350,000.
- Spainhour, L, (PI), R. Mussa (Co-PI) & J. Sobanjo
(Co-PI). “Traffic Records Automation-Phase III.” Funded by the Florida
Department of Transportation, Richard Sotter (Project Manager),
December 10, 2003 to September 30, 2004, $195,465.
- Sobanjo, J. (PI), L. Spainhour (Co-PI) & R. Mussa
(Co-PI). “Crash Location Reference and Sign Inventory System.” Funded
by the Florida Department of Transportation, Richard Sotter (Project
Manager), December 16, 2003 to September 30, 2004. $110,408.
- Mussa, R. (PI), L. Spainhour (Co-PI) & J. Sobanjo
(Co-PI). “Implementation of GIS for Crash Data Management.” Funded by
the Florida Department of Transportation, Richard Sotter (Project
Manager), November 1, 2002 to September 30, 2003, $200,000.
- Spainhour, L, (PI), J. Sobanjo (Co-PI) & R. Mussa
(Co-PI). “Traffic Records Automation Support.” Funded by the Florida
Department of Transportation, Richard Sotter (Project Manager),
November 1, 2002 to September 30, 2003, $191,274.
- Sobanjo, J. (PI), R. Mussa (Co-PI) & L. Spainhour
(Co-PI). “Crash Location Reference and Traffic Sign Inventory System.”
Funded by the Florida Department of Transportation, Richard Sotter
(Project Manager), November 1, 2002 to September 30, 2003. $178,000.
- Sobanjo, J. (PI), L. Spainhour (Co-PI) & R. Mussa
(Co-PI). “Location Reference System for Florida Roadway Crashes.”
Funded by the Florida Department of Transportation (FDOT), Stephen
Elliot (Program Manager), May 1, 2002 to April 30, 2003. $150,000.
- Spainhour, L. (PI), J. Sobanjo (Co-PI) & R. Mussa
(Co-PI). “Integrated Computer Systems for Traffic Records Data
Collection.” Funded by the Florida Department of Transportation (FDOT),
Stephen Elliot (Program Manager), May 1, 2002 to April 30, 2003.
$150,000.
- Mussa, R. (PI). “Quantifying the Effects of Raising Minimum
Speed on Rural Freeways and the Effects of Restricting the Truck Lanes
Only in Daytime.” Funded by the Florida Department of Transportation,
Eric Larson (Program Manager), September 1, 2001 to August 31, 2003.
$170,000.
- Mussa, R. (PI). “Effectiveness, Criteria, and Guidelines for
Triple Left Turn Lanes.” Funded by the Federal Highway Administration
(FHWA), Don Horn (Program Manager), August 13, 2001 to August 12, 2002.
$62,500.
- Mussa, R. (PI). “Providing Sustainable Employment for
Minorities and Females in Highway Construction through Networking and
Information Sharing.” Funded by the Federal Highway
Administration/Florida Department of Transportation, Sylvia Barge
(Program Manager), July 1, 2001 to June 30, 2004. $300,000.
- Mussa, R (PI) & J. Lutabingwa (Co-PI). “Integrating New
Technologies and Information Systems into Transportation Education in
Tanzania.” Funded by the United Negro College Fund, Special Programs
Corporation, Shelby Lewis (Project Manager), April 1, 2001 to March 30,
2003. $250,000.
- Harvey, B. (PI) & R. Mussa (Co-PI). “Improving Operation
of FDOT Telemetered Traffic Monitoring Sites (TTMS).” Funded by the
Florida Department of Transportation Planning Office, Harshad Desai
(Program Manager), April 1, 2000 to September 30, 2002. $260,000.
- Mussa, R. (PI) & Y. Abdelrazig (Co-PI). “Florida’s
Pre-Apprenticeship Training For Females in Highway Construction.”
Funded by the Florida Department of Transportation Minority Programs
Office, Sylvia Barge (Program Manager), July 1, 2000 to June 30, 2001.
$83,000.
- Mussa, R. (PI). “Telemetered Traffic Monitoring Sites for
Intelligent Transportation Systems Applications.” Funded by the
National Science Foundation, Alice W. Leeds (Program Manager), June
2000 to December 2000. $38,221.
- Mussa, R. (PI). “Summer Research Grant for Undergraduate
Students.” Granted by the McNair Post-Baccalaureate Achievement
Program, Florida A&M. Lisa McClelland (Project Manager, May-August,
1999. $8,000.