Large Wind
Missile Impact Performance of Public and Commercial
BuildingAssemblies, 130,000,
Florida
Division of Emergency Management, 2003-2004, N. Yazdani: PI, R. Cook and P.
Green (
Univ.
of
Florida
): Co-PI.
Florida
House
Learning
CenterHurricane Mitigation Project,
$52,000, Sarasota County, Florida, 2003-2004, N. Yazdani: PI.
Time Dependent
Strength and Elasticity Development in Florida Concrete, $120,000,
Florida Department of Transportation/Federal Highway Administration,
2001-2003, N. Yazdani: PI, L. Spainhour: Co-PI.
Development of
Wind Shelter Retrofit Room Standards for Existing Houses,$135,000,
Florida
Division of Emergency Management, 2001-2003,
N. Yazdani
: PI.
Application of Steel Fiber
Reinforcement in Anchorage Zones of Post-Tensioned Bridge Girders,
$118,000, Florida Department of Transportation/Federal Highway
Administration, 2000-2002, N. Yazdani: PI, L. Spainhour:
Co-PI.
Substitution of Components in FDOT
Concrete Design Mixes, $118,000, Florida Department of
Transportation/Federal Highway Administration, 1999-2001, N. Yazdani: PI.
Behavior of Thin PrecastPrestressed Spandrel Beams Under
Torsion, $20,000, Precast/Prestressed Concrete Institute (PCI) Daniel P.
Jenny Graduate Fellowship, 1999-2001, N. Yazdani: Supervisor, J.
Ach: Research Assistant.
Post-Storm Model for Reconstruction of
Coastal Structures, $120,000, Florida Sea Grant Program, National Ocean
and Atmospheric Association (NOAA), 1998-2001, N. Yazdani: PI.
Composite Fiber Wrapping for the
Strengthening and Repair of Bridge Elements in the Splash Zone, $150,000,
National Science Foundation, 1997-2001, L. Spainhour: PI, N.
Yazdani: Co-PI.
Utilization of Structural Composite
Lumber for Bridge Applications, $195,000,U.S. Department of
Transportation/Federal Highway Administration, 1997-2001, N. Yazdani: PI.
Investigation of Bridge Fenders for
Ship Impact, $140,000, Florida Department of Transportation/Federal Highway
Administration, 1997-2000, N. Yazdani: PI, J. Wekezer:
Co-PI.
Effect of Boundary Conditions on Bridge
Superstructure Performance, $75,000,
Florida Department of Transportation/Federal Highway
Administration, 1997-99, N. Yazdani: PI, L. Spainhour,
Co-PI.
Post-Storm Foundation Reconstruction
Model for Coastal Structures, $60,000, Florida Department of Environmental
Protection, 1997-99, N. Yazdani: PI.
SUCCEED: Years 6-10, $600,000,
National Science Foundation, 1996-1998: N. Yazdani, G. Buzyna,
B. Wang, S. Nnaji, and S. Awoniyi:
PI's.
Effect of Pumping on Properties of
Concrete: Phase II, $55,000, Florida Department of Transportation/Federal Highway
Administration, 1996-97, N. Yazdani: PI.
Post-Storm Reconstruction Model for
Coastal Structures: A Preliminary Study, $15,000, Florida Sea Grant
Program, National Ocean and Atmospheric Association (NOAA), 1996-97, N.
Yazdani: PI.
Epoxy Jointing of Precast
Concrete Segments, $50,000, Florida Department of Transportation/Federal Highway
Administration, 1995-97, N. Yazdani: PI.
Investigation of Excessive Camber in Precast
Concrete Beams, $90,000,
Florida Department of Transportation/Federal Highway
Administration, 1994-97, N. Yazdani: PI, P. Mtenga:
Co-PI.
Fiber Reinforced Cable Study, $185,000, National Security Agency, 1993-96, R. Arora
(E.E.): PI, H. Garmestani
(M.E.) and
N. Yazdani:Co-PI.
Alternative Success Model for
Engineering Faculty, $300,000, National Science Foundation SUCCEED
Coalition, 1994-96, N. Yazdani: PI, F. Najafi
(Univ.
of
Florida) and S. Middleton (Univ.
of
N. Carolina
at
Charlotte), and F. Najafi (Univ.
of
Florida): Co-PI.
Preservative Effect on Stress Laminated
Southern Pine
Bridge
Decks, $225,000,
U.S.
Department of Agriculture, 1992-96, N. Yazdani: PI.
Field Performance of Three Stress
Laminated Bridges in Leon
County, $10,000,
U.S.
Department of Agriculture, 1992-96, N. Yazdani: PI.
Effect of Pumping on Durability of
Bridge Concrete, $80,000, Florida Department of Transportation/Federal Highway
Administration, 1994-96, N. Yazdani: PI, W.
Ping
: Co-PI.
Impact of Swimming Pool on Coastal
Construction in the State of Florida, $50,000, Federal Emergency Management Agency
(FEMA)/Florida
Dept. of Natural Resources, 1993-94, N. Yazdani: PI, S. Nnaji:
Co-PI.
Influence of Temperature on Precast
Bridge Girders, $75,000, Florida Department of Transportation/Federal Highway
Administration, 1990-92, N. Yazdani: PI.
Multi-Agency Integrated Code for
Florida
Coastal Construction, $90,000, Coastal Zone Management, 1990-93, N.
Yazdani: PI.
Prevention of Cracking in Bridge Pier
Caps, $75,000, Florida Department of Transportation/Federal Highway
Administration, 1988-90, N. Yazdani: PI, W.O. Carter: Co-PI.
Effect of Wind on Coastal Construction
in Florida, $35,000, Florida
Department of Natural Resources, 1989-90, N. Yazdani: PI.