3/5
Finalize Energy Storage Quotes

                  3/12
-Design Review #2
-Finalize Solar Equipment Quotes
-Develop Generation Capacity Models

                3/19
-Scholarship in Practice
-Finalize Load Study

3/26
Operation Manual

4/1
Finalize 
Analysis

3/15
Finalize Bill Of Materials

3/8
Develop Return On Investment Model

3/22
Review Findings with Leon County

3/29
Make Final Project Changes

4/2
-Final Presentation