The progress of the project is delailed in the deliverables. These were manditory documents and dedlines we were required to make over the two-semester senior design class beginning in September, 2008. Below is a list with links to each of these assignments and to the various presentation we did over the course of the project.
EML-4551 Fall, 2008
09.09.08
10.02.08
10.16.08
11.06.08
12.04.08
EML-4552 Spring, 2009
01.15.0901.29.09
02.26.09
04.09.09
- Presentation: Final Project Review (.ppt)
- Final Report (.doc)
- Operations Manual (.doc)
- Poster (.ppt)