As of 4-04-18: Evidence Book
3-30-18: Operation Manual
10-16-17: Virtual Design Review 1
11-16-17: Virtual Design Review 2
12-05-17: Virtual Design Review 3 - Poster Presentation
2-20-18: Design Review 4
3-22-18: Design Review 5
4-02-18: Final Poster
4-6-18: Complete Building - Test chamber and sensor have some parts that must be machined / assembled
4-8-18: Complete Testing - Get data on both the control sensor and prototype
4-12-18: Engineering Day - Showcase results and progress
4-15-18: Final Report - Final documentation of project outlining success, failure and future considerations
4-18-18: Prototype Demo - Showing prototype sensor physically working