Project Deliverables

Report

As of 4-04-18: Evidence Book

3-30-18: Operation Manual

Presentations

10-16-17: Virtual Design Review 1

11-16-17: Virtual Design Review 2

12-05-17: Virtual Design Review 3 - Poster Presentation

2-20-18: Design Review 4

3-22-18: Design Review 5

4-02-18: Final Poster

Future

4-6-18: Complete Building - Test chamber and sensor have some parts that must be machined / assembled

4-8-18: Complete Testing - Get data on both the control sensor and prototype

4-12-18: Engineering Day - Showcase results and progress

4-15-18: Final Report - Final documentation of project outlining success, failure and future considerations

4-18-18: Prototype Demo - Showing prototype sensor physically working

Linkedin | Resume